


Location:
Hammond, IN
Completed:
October 2025
Client:
F.H. Paschen and Ragnar Benson Joint Venture
Designed by:
Jacobs Engineering Group
Over a three-year period, our crew erected over 15 million pounds of structural steel across a 7-mile corridor—supporting five new stations and setting 280 girders over 92 spans.
Using accelerated bridge construction methods, we delivered major steel installations with minimal disruption to surrounding communities. These bridges crossed a range of challenging environments, including active freight lines (CSX, Norfolk Southern, CN, Indiana Harbor Belt, and South Shore Line), busy roadways, and waterways.
If you have work that demands experience, precision, and grit—we’re ready to take it on.
Metropolitan Steel is an equal Employment Opportunity Employer.
Copyright © 2026 Metropolitan Steel. All Right Reserved.
1931 East 177th Street Lansing, IL 60438
